Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

  • Epoxied the flanges to the carbon fiber tubes
  • To Do:
    • Create/have made an assembly for 8-10 of the DB 9 cable connectors within the box for the lab jack
    • Put together wiring for the power supply

Tues June 21

  • Cut and filed more carbon fiber tubes
  • Assemble 7 more of the wind sensors connected to DB9 ribbon cable in tubes
  • Test that all of the electronics were workingTo Do:
  • Create/have made an assembly for 8-10 of the DB 9 cable connectors within the box for the lab jack
  • Put together wiring for the power supply

Mon June 20

  • Assembled shelves at storage unit
  • Loaded U Haul with lab equipment
  • Moved Equipment into storage unit
  • Lunch at Shang Cho afterwards
    • Fried rice
  • Honey Comb PB Pretzel ice cream

...