Item | Detailed Description | Deadline |
---|---|---|
Conceptual Design Review | Meghan will create a detailed presentation describing the system we are to build and its purpose, and be as detailed as possible (including part numbers). Meghan will then present this slide deck to Prof. Stubbs and Elana - we will find a time hopefully before Friday Feb 2. | Saturday, Jan 27 |
Software/Hardware Preliminary Decisions | Meghan and Prof. Stubbs will decide on:
Above hardware should then be ordered (asap). | Friday, Jan 26 |
Steerable Collimated Beam | Have a single, steerable collimated beam working. This will involve:
| |
Scale to Six Steerable Beams | Add the other beamsplitters so that the system is scaled to its full size.
| |
Local Telescope Test | Set up the system for the telescope we have here to test the differential monitoring.
| preferably before Friday, April 2626 but there is some wiggle room |