  • Made a ticket for the AuxTel baffle: https://jira.lsstcorp.org/browse/SUMMIT-8089
  • Heard back from Todd at the machine shop - they will have the parts done by the end of the week.
  • At CBP update meeting, I learned that the electrometer CSC has to be designed so that it can take both the Keithley and the electrometer in one. I have to make sure I modify things correctly. I think I've been doing it wrong...
  • Had issues with pushing the Keysight electrometer code to the lsst-ts GitHub. I had to set up 2FA on GitHub and then it worked fine.
  • Got a response back from Applied Image. Seems like the dxf files didn't properly convert between AutoDesk Fusion and AutoCad, and for some reason the scaling was off by an order of magnitude and there were extra lines in some of the dots. Hopefully we're solving that now...
  • Spent a long time looking for the right adapters for the Meade telescope, and also looking at various manuals and online to figure out the location of the focus behind the secondary. I was unsuccessful, but I have some slightly wrong adapters that should work.


October 26, 2023

  • Worked with Ali on the paper. He's doing great!
  • Got new masks from DeeDee. See CBP mask confluence page: https://confluence.lsstcorp.org/display/LTS/Rubin+CBP+mask+design+notes
  • The diameter of M1 for the telescope Chris got is 304.8 mm (or, that's what's quoted as the size). So I measured out 304.8 mm and moved an LED (not a laser as Chris wanted) until the beam on the wall was that size. 
    View file
    nameIMG_0178.HEIC
    height250
    View file
    nameIMG_0179.HEIC
    height250
    • The location of collimation was closer to the primary than I was expecting. Pulling back the fiber location did decrease the size of the resultant spot.