Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.


October 24, 2023

...

  • Worked with Johnny, who repointed and refocused DIMSUM. The PSFs aren't great, but Johnny confirmed none of them are donuts. They're workable. I set it up to take two bursts every 10 minutes 500 times.
  • Gave Larom the IDF EFD hexapod data. She'll get to it sooner than Guillem. She'll model the hexapod X, Y, and Z position as a function of elevation and temperature, compare her results to Chris's results, and seeing if there's a significant difference in the modeling before and after Feb. 2023 (CWFS to WEP), and look at the rms of the model fit.
  • Got parts back from the machine shop. They work! We can now solder the photodiode.
  • Booked lodging for the trip to Tucson.

November 8, 2023


November 9, 2023


November 10, 2023


November 11, 2023

  • Finished soldering and took photodiode QE data (see confluence page)

November 13, 2023


November 14, 2023

  • submitted the Image Quality SPIE abstract and uploaded the final version to docushare
  • began taking DIMSUM data again at 11:38 am MST
  • fixed the Keithley CSC
  • analyzed the photodiode QE data (see confluence page)

November 15, 2023

  • Made an assembly diagram for the CBP calibration system, sent it to Parker, and added it to the confluence page