LTS Discovery Portfolio Summer 2026 in Review [text version]
Summer 2026 in review
Five sprints, June 6 – August 18 · a completed refactor, a Viewer upgrade launch, and a step change in security maintenance.
ACORN refactor
Released · A COnservation Records Network · Preservation Services
A full rebuild of mission-critical conservation software, delivered with Notch8. Security hardening and a sustainable codebase underneath; a broad set of user-facing improvements on top — including functionality lost in an earlier upgrade.
Item records. Work Types for analysis & testing; "Ready to Return" flag
Workflow. Long-standing record-locking blocks resolved
Reporting. Rich text and PDF export for every report
Search. "All fields" keyword; more accurate results
Admin console. New management screens, usability fixes
Under the hood. Accessibility tested, dependencies updated
Some of this restores functionality lost in a previous upgrade; the rest is new. Partners: Notch8, LTS DevSecOps, Service Owner Debra Cuoco, and WPC staff who tested and retested.
6 — areas reworked, from item records to admin
1:1 — side-by-side parity check vs. the old system
Detail
Item records
Work Types expanded to cover technical analysis and research & testing workflows
Fields reordered and modified for cleaner navigation and data entry
New "Ready to Return" flag for object tracking
New tool to find previously-treated items, with the ability to link treatment records
Workflow
Resolved long-standing record-locking problems that erroneously blocked staff from doing their work
Reporting & export
Rich text formatting supported in all reports
PDF export available for all reports
Non-Western characters now render correctly
Search
Advanced Search gains an "all fields" keyword option
More complete dropdown menus; more accurate results
Admin console
New management screens plus a range of smaller usability improvements
Under the hood
Tested against accessibility standards
Third-party dependencies reviewed and updated; significant security improvements
Automated checks widened to catch problems before users see them
Final side-by-side comparison with the old system confirmed nothing was left behind
Codebase updated to make ongoing maintenance sustainable
Some updates restore functionality lost in a previous upgrade; others are new. Service Owner: Debra Cuoco. Tested and retested by WPC staff.
Viewer → Mirador 4
Launched Sept 1 · Aligned to modern front-end standards
Begun July 7 and now feature-complete in staging: Harvard's theme and every plugin reconnected, Material UI jumped v4 → v7, and the first automated UI testing pipeline in the portfolio. Production Mirador 3 stayed patchable throughout.
Sprint of Jul 7. M3/M4 toggle across all environments; stock M4 instance; 12 plugins made compatible
Sprint of Jul 21. Harvard theme applied (Material UI v4 → v7); 8 custom + 2 community plugins connected
Sprint of Aug 4. Playwright + GitHub Actions UI testing; last 2 plugins; faster, reliable deep links
Next. Launch — accessibility and UX gains, simpler upgrades from here
Meanwhile in production: a clear log-in prompt replaces the generic error on restricted downloads, a URN punctuation bug no longer blocks images, and large-object PDF generation truly streams.
10/10 — Harvard plugins upgraded and connected
+3 — community plugins: sharing, image tools, download
Detail
Sprint of July 7 — foundation
Added a toggle between Mirador 3 and 4 across all environments, so emergency fixes and security patches could still reach production during the upgrade
Stood up a standard, out-of-the-box Mirador 4 instance
Updated all ten Viewer plugins for compatibility with standard Mirador 4
Sprint of July 21 — Harvarding it up
Applied Harvard's custom theme to the stock Mirador 4 interface — including a jump from Material UI v4 to v7
Retired two custom plugins in favor community-supported options: object sharing, downloading, and image manipulation
Connected ten of Harvard's upgraded custom plugins
Sprint of Aug 4 — testing and performance
First automated UI testing pipeline in the portfolio: Playwright + GitHub Actions, running on every code change
Connected the final two custom plugins — 10 of 10 now live in Mirador 4
Reworked document loading logic: faster loads, and reliable deep links to specific pages of page-turned objects on slow connections
Test coverage badges added to every plugin repository
Production Viewer, meanwhile
Anonymous users hitting restricted material now get a clear prompt to log in, not a generic error (Aug 18)
Fixed a bug where URNs with valid punctuation prevented images from loading (Jul 21)
PDF generation for very large page-turned objects now truly streams page-by-page — no more timeouts (Jun 23)
Why it matters
Aligns the Viewer with modern front-end standards and simplifies ongoing maintenance
Adds accessibility and UX enhancements
Builds directly on the March Mirador 3 release and its plugin ecosystem — the changes touch nearly every line of code
Security maintenance
Patching is ongoing — but the volume is not what it used to be.
18 patching tickets by this point last year — compared to 33 this year to-date, that is an increase of 83%. This is before 16 more tickets of security work we only started tracking separately this year.
21 high-severity and critical vulnerabilities resolved this summer alone
Logging pulled out of Viewer and Embed, HarvardKey brought to HUIT standards
Also shipped
MPS ingest streamlined for DRS3
Manifest bug open 4 years fixed — plus 3 more
PDF generation now truly streams
Ingest-worker test coverage 58% → 91%
CURIOSity: permissions, masonry, controlled tags