Skip to end of metadata
Go to start of metadata
Wed June 22
- Epoxied the flanges to the carbon fiber tubes
Tues June 21
- Cut and filed more carbon fiber tubes
- Assemble 7 more of the wind sensors connected to DB9 ribbon cable in tubes
- Test that all of the electronics were working
Mon June 20
- Assembled shelves at storage unit
- Loaded U Haul with lab equipment
- Moved Equipment into storage unit
- Lunch at Shang Cho afterwards
- Honey Comb PB Pretzel ice cream
Fri June 17
- Got a lesson about screws, and read more about screws
- Installed lab jack software on Mac
- Hooked up one wind sensor to the LabJack to test it out while connected to the Mac
- Cut one carbon fiber tube in half and assembled one of these sensors with stands without any adhesive. It fits well, the ribbon cord needs to be pushed in.
- Need to learn how to write code to get from the voltage numbers to wind speed
Thurs June 16
- Mapped out the wind sensing system
- Completed online general lab safety course
- Completed online physics machine shop and Makerspace safety course
- Hooked up the hot wire anemometer to a voltmeter to test it out
- GND-White 5
- +9-12V -Violet 4
- OUT - Orange 2
- TMP - Green 3
- SHDN - Brown 1
- Like so:
-
- Knotted cable is ground
Wed June 15
- Met the group and learned the basics of some of the various projects
- Learned to use the coffee machine !!!
- Learned to solder and soldered right angle pins onto the wind sensors
- Set up a Mac mini