Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

Wed June

...

  • Met the group and learned the basics of some of the various projects
  • Learned to use the coffee machine !!!
  • Learned to solder and soldered right angle pins onto the wind sensors
  • Set up a Mac mini

22

  • Epoxied the flanges to the carbon fiber tubes

Tues June 21

  • Cut and filed more carbon fiber tubes
  • Assemble 7 more of the wind sensors connected to DB9 ribbon cable in tubes
  • Test that all of the electronics were working

Mon June 20

  • Assembled shelves at storage unit
  • Loaded U Haul with lab equipment
  • Moved Equipment into storage unit
  • Lunch at Shang Cho afterwards
    • Fried rice
  • Honey Comb PB Pretzel ice cream

Fri June 17

  • Got a lesson about screws, and read more about screws
  • Installed lab jack software on Mac
  • Hooked up one wind sensor to the LabJack to test it out while connected to the Mac
  • Cut one carbon fiber tube in half and assembled one of these sensors with stands without any adhesive. It fits well, the ribbon cord needs to be pushed in.
  • Need to learn how to write code to get from the voltage numbers to wind speed

Thurs June 16

  • Mapped out the wind sensing system  
  • Completed online general lab safety course
  • Completed online physics machine shop and Makerspace safety course
  • Hooked up the hot wire anemometer to a voltmeter to test it out
    • GND-White 5
    • +9-12V -Violet 4
    • OUT - Orange 2
    • TMP - Green 3
    • SHDN - Brown 1
  • Like so:
  •                            
  • Knotted cable is ground

...

Wed June

...

15

  • Met the group and learned the basics of some of the various projects
  • Learned to use the coffee machine !!!
  • Learned to solder and soldered right angle pins onto the wind sensors
  • Set up a Mac mini