...
- remotely controlled power strips (PDUs)
- backup 5 mm slit for OSELOTs
- Sasha's new OSELOTS fiber coupling system
- new lithium battery
Sept 11 2022 planning for Nov 2022:
A. revision of image quality instrumentation
Both of these should require only power, no exiting cables.
- move differential temperature sensors onto telescope trusses
- extra cable, soldering iron, hand tools, heat shrink, power strip and extension cord
- perhaps mount anemometer on fork mount?
Pre-requisites: 1) Ship box of stuff to Pachon, 2) verify data paths back to Boston