Task | To do before going to Chile | To do in Chile | Notes | |
---|---|---|---|---|
Shack-Hartmann Sensor | Finish building/prototyping | Install in Nasmyth Port | Bring to Chile | |
Nasmyth Port Mount | Install | |||
Anemometer | finish codeĀ make sure lab jack + computer can be connected to network | Install | Bring stand to Chile | |
All-Sky Camera | Work with Brian Stalder to set it up | |||
ADS-B receiver | Chris will talk to Chuck | Defer- summer task for student | ||
DIMM | complete control software | Install | Bring optics to Chile | |
Main Telescope | Help Kevin as needed | |||
Aux Tel Run | Learn how to use Aux Tel and run it for additional nights if possible | |||
Differential temperature sensor | Put it in better packaging finish software | Install | ||
Tension Meter | Make sure it works Box it | |||
Sky Spectrograph | Add optical fiber feed | Install | ||
Temperature/wind speed Sensors | Write control software | Install | STRETCH GOAL | |
design front-baffle for Aux tel | measure how the Hartmann screen mounts on the top end. Figure out how to construct something that will support around 15 pounds of optical gear | |||
measure temperature coefficient of LATISS gain | Take photon transfer curve data at different dome temperatures and thermostat settings on top of readout board, determine d(gain)/dT |
Page Comparison
General
Content
Integrations