To do in Chile 2022
To do in Chile 2022
Task | To do before going to Chile | To do in Chile | Notes |
---|---|---|---|
Shack-Hartmann Sensor | Finish building/prototyping | Install in Nasmyth Port | Bring to Chile |
Nasmyth Port Mount | Install | ||
Anemometer | finish code make sure lab jack + computer can be connected to network | Install | |
All-Sky Camera | Work with Brian Stalder to set it up | ||
ADS-B receiver | Chris will talk to Chuck | Defer- summer task for student | |
DIMM | complete control software | Install | Bring optics to Chile |
Main Telescope | Help Kevin as needed | ||
Aux Tel Run | Learn how to use Aux Tel and run it for additional nights if possible | ||
Differential temperature sensor | Put it in better packaging finish software | Install | |
Tension Meter | Make sure it works Box it | ||
Sky Spectrograph | Add optical fiber feed | Install | |
Temperature/wind speed Sensors | Write control software | Install | STRETCH GOAL |
design front-baffle for Aux tel | measure how the Hartmann screen mounts on the top end. Figure out how to construct something that will support around 15 pounds of optical gear | ||
measure temperature coefficient of LATISS gain | Take photon transfer curve data at different dome temperatures and thermostat settings on top of readout board, determine d(gain)/dT |