Planning for the next trip to Chile (tentatively scheduled for January 2023)

Things to do:

  • install anemometer power supply, if not done already
  • install remotely controlled power strip
  • install new fiber-slit coupling system for OSELOTs
    • two options: glue the current fiber mount to slit, or use Sasha's new system

...

  • remotely controlled power strips (PDUs)
  • backup 5 mm slit for OSELOTs
  • Sasha's new OSELOTS fiber coupling system
  • new lithium battery

Sept 11 2022 planning for Nov 2022: 

A. revision of image quality instrumentation

B. revive top end tension meter- requires taking oscilloscope with Fourier analysis. 

Both of these should require only power, no exiting cables. 

...

Pre-requisites: 1) Ship box of stuff to Pachon, 2) verify data paths back to Boston

Ship ahead of time: 

itemvaluevendorstatus

110 and 220 V dual mode soldering iron.
Sugon A9 soldering station

$100Amazondelivered
instrumentation cable, 1 spool$50NAget from lab
heat shrink and solder and solder wick$10NAget from lab
magnifier for soldering$30NAordered
hand tools- pliers, wire stripper, etc$80Amazonget from lab
higher dispersion blazed grating, 50 x 50 mm$300edmundon hand, needs adapter
scope with Fourier analysis - battery powered one? 

on hand, in lab. 




Shipping the soldering iron + station and magnifier for soldering on 10/15/2022