TaskTo do before going to ChileTo do in ChileNotes
Shack-Hartmann SensorFinish building/prototypingInstall in Nasmyth PortBring to Chile
Nasmyth Port Mount
Install
Anemometer

finish codeĀ 

make sure lab jack + computer can be connected to network

Install
All-Sky Camera
Work with Brian Stalder to set it up
ADS-B receiverChris will talk to Chuck
Defer- summer task for student
DIMMcomplete control softwareInstallBring optics to Chile
Main Telescope
Help Kevin as needed
Aux Tel Run
Learn how to use Aux Tel and run it for additional nights if possible
Differential temperature sensor

Put it in better packaging

finish software

Install
Tension Meter

Make sure it works

Box it


Sky SpectrographAdd optical fiber feedInstall
Temperature/wind speed SensorsWrite control softwareInstallSTRETCH GOAL
design front-baffle for Aux tel
measure how the Hartmann screen mounts on the top end. Figure out how to construct something that will support around 15 pounds of optical gear
measure temperature coefficient of LATISS gain
Take photon transfer curve data at different dome temperatures and thermostat settings on top of readout board, determine d(gain)/dT