Show shadows, how light goes through the building.
Site relationship to the context, what is happening in the background, which other buildings are present, how it relates to the street.
Prerequisites
Existing 3D model of building
Make sure all surfaces are continuous and all pieces are aligned, this is done by making sure all curves are continuous before they become extruded
Make sure you don’t have any open faces in the model, only solids
Window planes should be individual elements between moleons, avoid continuous plans through other objects. Same for columns, have sets of columns for each floor, instead of continuous ones through the building
Camera settings - 1-point perspective, 35-50mm
Set up 3-4 new layers
Cut
Foreground
Background
Other (structure, particular objects of interests…)
Project sepcifities
22 floors
560 beds with 60% of one bedroom, 20% of 2 bedrooms, 20% of 3-4 bedrooms
Prepare the linework (25min)
Cut the plan where you will draw the section and rotate
Add the cut line then add the following lines
1m below the line for the second linewidth (spatial)
3m below that second line, add a third line for the third linewidth (surface), below that will be everything that remains in the lightest color, maybe furniture layer
About 3m above the cut line add two lines which generate the height of each floor, from floor below to floor above
Once these are added, start reporting all of the lines of the objects which intersect the cut plane
Produce one line from the deepest part of the plan and copy along the cut line axis to go faster
Reproduce process for the different floors for which you have a plan
Lock the layer of these lines
Drawing vertical lines (15min)
Do all plans at once in this fashion
Start drawing the lines from floor to ceiling (spatial layer)
Add the cut lines
Add the surface lines
Drawing horizontal lines (35min)
Add horizontal lines of handrails (create a block first)
Add doorways and windows (create a block first)
Add block furniture
Add stairs
Add hatches
Updating particulare spaces (100min)
Assemble all individual sections together (30omin)
Refine differences between floors, atrium and public spaces (70min)
Create the cut outline of the empty space
Put everything in it as light background
Add a thin hatch to differentiate the zone from the others
Limitations & Disclaimer
The time estimates represented in this workflow is estimated based on a specific model / input. Actual time required may vary depending on specific use scenarios.