Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Version History

« Previous Version 13 Next »

Dec 2023, Stubbs & Urbach

Goals

Upgrade DIMSUM- new lens, more sources, wider separation new mount- in progress

Dome and vent airflow measurements with wind speed sensor- Tues

Aux Tel dome slit vignetting tests vs. elevation angle. - needs engr time, no opportunity

Dream all-sky camera data access and analysis. Not accessible yet

Extinction tests with imaging data and with full-spectrum Aux Tel data. - Colin? 




Take



DUMSUM2: Canon lens, new SD cards, battery eliminator, mechanical mounting parts, screws and bolt and fastners
Optical fibers, 



new baffle

SMA connectors for peg board

wind speed sensor (in Stubbs office)

get

large pegboard at Sodimac?- not avail

Bring next time (after Dec 2023)

large coffee mug

SMA-to-SMA fiber couplers

helmet



additional disks for DIMSUM

DIMSUM-2 for main dome

send large pegboard and SMA mount parts for DIMSUM-2



additinal ND filters. More fibers, with apprpropriate downsizing to 200 microns

LR44 batteries for calipers

pegboard extenders

Tasks for Feb 2024 trip



revise DIMSUM fiber arrangement to 16 x 200 um

test w varying sources

figure out mounting for long Thor labs rail in Aux Tel dome and main dome too

revise spectro scheduler

talk w Merlin about integrating DIM SUM into Rubin TV

joint anemometer and DIMM and DIMSUM data collection

Work w Kevin on fan for DIMM Dome

GAI

find a location for DIMSUM2 in main dome

find pegboard in storage locker

EFD access and visit database


Wed plan:

battery eliminators
wind speed measurements
AstroChat demo
EFD pointing from DIMM?

  • No labels