Feb 2024 Aux Tel
date | |||
---|---|---|---|
Feb 10, 11 2024 | dome closed all day. good comparison for subsequent days | ||
Feb 12 2024 | dome slit opened 1547 UT all four vents opened, slit ~10% (by eyeball), extraction fan VFD at 50Hz (oft mis-characterized as "percent") if you wish to check your telemetry. I will be working on deciphering the extraction fan VFD modbus command structures this afternoon, so fan speed will probably be changing quite a bit Air temp dropped 5C upon opening the slit. Tests for Feb 13: 1) roll telescope to horizon for storage | ||
Feb 13 2024 | 0900 local - Plan is to roll telescope over to low elevation to keep M2 from baking, point telescope N at low elevation, and dome slit S cracked open. Lower vent open and fan at full speed, exhausting through vent. Error at 1600 local where shutter was closed 1713 local- more issues with dome. It's now being shut again. 1732 local - shutter now 100% open and dome slit pointed East. | ||
Feb 12, 2024
Goal is to do some thermal management tests with Aux Tel.
Fritz says dome shutter open fraction and orientation are accessible in EFD and chronograf.
Added dome shutter open fraction and orientation to IQ Trial panel in coronagraf.
Analysis tasks: compare dome status and vent fan speed to temperature behavior for Feb 12 and Feb 13. Compare Aux Tel daytime dome temp with main telescope.
Copyright © 2024 The President and Fellows of Harvard College * Accessibility * Support * Request Access * Terms of Use